Partner pathway — architects

How HNordic partners with architects

Specify the heating system at the supply temperature the building standard and the heat pump actually require. EHP® central heating radiators are designed for this range.

Architect reviewing building plans with EHP® radiator specification drawings, clean modern office

The specification problem EHP® solves

Every current commercial building standard — EPBD 2024, Part L, passive house, BREEAM, LEED — requires heating systems that operate efficiently at low supply temperatures. The reasoning is consistent: a building designed to lose less heat should be heated by a system that generates heat efficiently. High-temperature radiators are a fundamental mismatch with that logic.

The heat pump does not resolve this. Heat pumps are now standard specification for low-energy commercial buildings, and they are correctly designed to operate at 35–45°C. The problem is that conventional radiators require 55–80°C — which forces the heat pump above its efficient range, opens the gap between modelled and actual energy performance, and creates a compliance problem that is difficult to close at practical completion without replacing the heating distribution system.

EHP® central heating radiators operate at 30–35°C. They are specified for the supply temperature the building standard requires and the heat pump was designed to deliver. The compliance gap does not open, because the system is designed for the temperature from the start.

How HNordic partners with architects

Architects specifying EHP® central heating radiators receive full technical support at design stage. We provide specification documentation suitable for inclusion in contract document packages — operating temperature range, hydronic connection specification, water displacement figures for system balancing, maintenance requirements (zero, sealed system), heat pump compatibility parameters, and EHP® electric radiator electrical specification.

We engage at the point where the specification actually matters: before tender, before planning, at design stage. Not at practical completion when the heating system is already installed and the compliance gap is already open.

For projects where the full HNordic energy stack is under consideration — EHP® radiators alongside cylindrical wind turbines, battery storage, and an AI energy management system — we provide whole-system assessment at design stage, including the interaction between heating demand reduction and generation system sizing.

Why EHP® changes the low-energy design brief

When a building's heating system operates at 30–35°C rather than 55–80°C, several things change at the design stage that are worth understanding.

The heat pump operates in its designed efficiency range from day one. The gap between modelled and measured energy performance — persistent and well-documented in commercial low-energy buildings — does not open. EPBD 2024 near-zero energy performance targets become achievable through the heating specification itself, not through compensating measures elsewhere in the building.

No service access is required in the building specification for the radiator itself — the working fluid is sealed for the product's 25-year life. This simplifies M&E coordination and removes a recurring maintenance obligation from the building's long-term operating model.

No F-gas regulation applies to the EHP® working fluid. It is not a refrigerant. No leak detection requirement, no F-gas competency requirement for installers, no interaction with refrigerant-based cooling systems in the building.

And for new-build and major retrofit projects, the specification decision about whether the building is compatible with 5th-generation district heating infrastructure matters now. 5G networks operate at 25–35°C — the range EHP® central heating radiators are designed for as their primary condition. A building specified with conventional radiators is not compatible without full radiator replacement. A building specified with EHP® radiators connects without modification.

Specification documentation

Technical specification documentation is available on request for inclusion in contract document packages. Contents:

Specification support

Discuss EHP® for your project

We provide specification documentation and technical input at design stage — before tender, at the point where the specification decision changes the building.

Get in touch