Heating Incentives — Sweden

Grants and incentives for EHP® radiators in Sweden

Grant funding and compliance pathways for commercial heating upgrades in Sweden – what applies to EHP® installations, amounts, and how to apply.

How Swedish incentives apply to EHP® installations

Heating accounts for between 65% and 80% of total energy consumption in Nordic commercial buildings. EHP® (Enhanced Heat Performance) nanotechnology radiators reduce that consumption by up to 55% by operating at 30–35°C supply temperature rather than the 55–80°C required by conventional central heating radiators. That reduction in operating temperature is the qualifying mechanism for Swedish energy efficiency incentives.

Sweden operates two distinct pathways: a competitive grant programme for commercial climate investment, and a statutory audit obligation that applies to large enterprises. For smaller commercial buildings, the grant programme is the primary route. For large enterprises, the audit obligation creates the internal mandate that makes heating capex straightforward to approve.

Grant programme

Klimatklivet — the Climate Leap

Programme type: Competitive grant

Administering body: Naturvårdsverket (Swedish Environmental Protection Agency)

Programme dates: Annual rounds. The 2026 round closed 4 September 2026. The next round is expected to open in early 2027.

Source: naturvardsverket.se

Klimatklivet funds investment in measures that reduce greenhouse gas emissions in Sweden. Commercial energy efficiency upgrades qualify where the applicant can demonstrate a reduction in CO₂ equivalent emissions per krona invested. EHP® central heating radiators qualify on this basis: a documented reduction in heating energy consumption translates directly into a reduction in emissions from the heat source – whether district heating, gas, or oil-fired systems.

Grant rates are not published as fixed percentages. Klimatklivet is competitive: applications are assessed against each other in each round, and awards reflect the cost per tonne of CO₂ reduced. Well-prepared applications with clear baseline measurements and documented projected reductions perform better. Applicants are advised to commission an energy audit before applying – both to establish the baseline and to provide the documentation the application requires.

How EHP® qualifies: The operating temperature reduction from conventional to EHP® is the qualifying mechanism. An application should document current heating energy consumption, supply temperature, and the projected reduction after installation. Where EHP® radiators are installed alongside a heat pump – enabling the heat pump to operate at significantly higher efficiency – the combined carbon reduction case strengthens the application.

How to apply: Applications are submitted through Naturvårdsverket's online portal during the open window. The next round is expected Q1 2027. HNordic can provide technical documentation of projected energy consumption reduction for inclusion in the application.

Compliance obligation

Swedish EKL Energy Audit Act — EED Recast 2023/1791

Programme type: Statutory compliance obligation

Administering body: Energimyndigheten (Swedish Energy Agency)

Programme dates: First audit deadline 11 October 2026 (enterprises >10 TJ annual consumption). ISO 50001 energy management system required by 11 October 2027 (enterprises >85 TJ).

Source: energimyndigheten.se

The Swedish EKL Energy Audit Act, updated to implement the EED Recast Directive 2023/1791, requires large enterprises to commission an independent energy audit at least every four years. For enterprises consuming more than 10 TJ annually, the first audit under the new requirements was due by 11 October 2026. The audit must cover all energy-consuming activities, with recommendations for improvement.

This is not a grant programme. It is a compliance obligation. Its relevance to EHP® installations is structural: heating is invariably the largest energy cost identified in commercial building audits. The audit recommendation to upgrade the heating system arrives with documented figures, an identified baseline, and board-level visibility. That combination – documented problem, quantified saving opportunity, executive awareness – is the internal mandate that makes capital approval for an EHP® installation straightforward.

For enterprises approaching the ISO 50001 requirement, an EHP® installation that reduces heating energy by up to 55% is a material contribution to the energy performance improvement the management system is required to demonstrate.

How to use EKL as a funding lever: Commission the audit. Include heating in the scope. Document the baseline. Use the audit output as the basis for a Klimatklivet application in the next round. The two instruments are designed to work in sequence.

A note

ROT deduction — not available for commercial buildings

The ROT avdrag provides a 30% tax relief on installation labour costs for residential property owners. It does not apply to commercial property owned or operated by a limited company (aktiebolag). This distinction matters because Swedish commercial property managers sometimes assume the deduction is available – it is not, for the majority of commercial EHP® installations. The relevant route to cost reduction for commercial buildings is Klimatklivet and the EKL compliance pathway, not ROT.

Sweden — project enquiry

What applies to your Swedish building

Eligibility for Klimatklivet depends on building type, baseline consumption, and the quality of the application. We can provide the technical documentation your application requires.

Get in touch